Clearly...we would never have been able to build this house ourselves. We both don't know how Derek is building their house...we both would have threw our hands up and walked away by now...
Wednesday we went to the house to put in a piece of 2x4 behind the drywall in the shower so that when we get a door for it, we will be able to attach the door to something other than the drywall and the ceramic tiles. Sounds pretty easy, right? Well...keep in mind that although there is electricity in the house, nothing is wired up, so there are no lights, with the exception of one that they have in the mudroom...which doesn't shine much light upstairs in the bathroom. We brought one of those million candlewatt power light things...which lasts for maybe 20 minutes or so and then dies, and when plugged in, it doesn't get brighter, it still dies. I would have thought that plugging it would charge it, but also allow us to use it at the same time...wrong. We also didn't have a ladder or anything else to stand on, so we were using pieces of 2x12's to stand on, which are oh so sturdy. Ryan was taking the piece of drywall off the wall, and I was trying to put up our lights that we bought to make sure that the framing wasn't going to be in the way. He got the piece off, and grabbed the tape measure and started measuring how long the 2x4 was going to have to be. He marked down where to cut, and proceeded to cut...with a hand saw...That's right...No electric saw around. Instead of cutting it either downstairs in the mudroom where the light was, or cutting where there wasn't a 9 foot drop to the livingroom, he cut the piece of 2x4 on the catwalk upstairs...which is open (and I mean OPEN) to below, in the dark.
He finished cutting the piece, brought it into the bathroom and tried it out...it was too short. I think about 2 inches too short. What's that construction saying? Measure twice, cut once? You'd think we'd already know that by now... So that piece was shot. He grabbed another piece but this time, before measuring, he decided to move another piece of 2x6 that he had put in there a few months ago, and just measure from the floor to the ceiling. After doing that, he realized that he didn't have to cut anything at all.
Next, he started to nail the board in place. Then he decided that instead of nailing it in, he would screw it in. He would put the board in place, and then measure everything to make sure it was the same distance away from the wall at all points. He asked me to come and hold the board in place while he used the drill. He would start drilling, and the board would move. He'd get mad at me because I was moving the board. I told him to just put the screw in part way, and then we could measure it up and make sure it was level (we did bring a level...however, it was the size of a sand timer/hour glass thing that would come in a board game). He did that for the bottom one, and then we measured again and tried to do the top one...same thing. He would start the drill, and put pressure on the board while I was holding it, and it moved, and he would get mad. It was pretty funny. We finally got the board in there, and replaced the drywall that we had removed.
In that time, throughout the interuptions, I was able to figure out that the lights that we had bought for above the bathroom door on the outside and on the inside, weren't going to work, unless the guys move the lightbox up a few inches. That was disappointing. Then I decided to try and see if the lights that we had ordered from the States to go in the livingroom and the hallway downstairs would work in those spots...and they fit perfectly! We decided that we would return the other lights to Home Depot and buy three more of the lights that are going in the livingroom to use where the others were going to go.
Glen the Finisher got the windows in the livingroom done. They look pretty good, although the pictures don't really do it any justice. The stairs were built going from the garage into the house (no pictures, too dark in the garage), and the holes were cut for them to start building the staircase railings. I think that was about it...Oh, no, wait. Murray the Framer was out and built the walls downstairs, so I would imagine that on Thursday they will be insulating and polying.
Here are the pictures from Wednesday...